  • PNom sharing: new management (groups of sub-arrays), checks, warnings, etc.
  • current” replaces some losses which were previously registered as “inverter loss below voltage threshold”.
  • Inverter input: explicit management of the Maximum current per MPPT.
  • a factor of 2 or more!)Īdd the contribution of the Diffuse seen from the rear side.Īlbedo in monthly values.Seasonal orientation: possibility of negative summer tilt for low Latitudes. Improved the parameter import from the “real” system defined in 3DĬonceptual error in the model, which lead to an underestimation of the rear side irradiance by a factor of 1/GCR (i.e.
  • Bifacial 2D model: improved model for operating limit conditions (large heights),.
  • Unavailability loss: periods sometimes specified for another year than.
  • Analyse of Measured data: error preventing any simulation (V 6.64 only).
  • Some very special cases, EOutInverter may slightly overcome PNom (0.03% error).
  • Maxim optimizers: don’t appear in lists (in the version 6.64 only).
  • Only significant when very big electrical shading contribution.
  • SolarEdge with Ageing: error in ModuleLayout,.
  • SolarEdge optimizers: error when 2 modules strings at the optimizer input.
  • Mismatch Rms values for ISC and Voc are null.
  • SolarEdge and other optimizers used with Ageing: simulation crash when the.
  • Were not well recorded on files (=> necessitate redefinition at each run)
  • Variables specified for CSV hourly files or Monthly tables.
  • (only significant with very high azimuths like 180°)
  • Trackers “tilted or horizontal axis”: errors when axis azimuth is not null.
  • Shading 3D Helios3D and complex scene: sometimes higher shading losses due toĮrroneous identification “Behing the plane”.
  • Shading 3D: in some cases, different plane orientations are not recognized.









  • Pvsyst 6